Home / Cases

Cases: how it went

Not just "we delivered" but how: the task, what stood in the way and what the client got. Client names stay confidential.

8producers checked before choosing the quicklime supplier
≈ 30%cheaper than local suppliers
3,500 ttwo cargoes on one vessel
8+ yearsof sourcing in China
Raw materials · 2022

2,000 tonnes of quicklime for an aerated-concrete plant

Local suppliers kept missing deadlines. We found the material in China at a producer with no export licence — and exported it through our own company.

1

The task

An aerated-concrete plant needed quicklime, its main raw material. Its suppliers in Russia kept missing deadlines — rail cars and material were short.

2

What stood in the way

The producer that passed our checks sold only within Liaoning province: it had no export licence, so it could not sell abroad directly.

3

What we did

  1. Visited 8 Chinese producers and tested their quicklime.
  2. Chose the right one — which turned out to have no export licence.
  3. Bought through our company in China and handled the export ourselves.
  4. Combined it on one vessel with 1,500 t of mineral filler from Shandong.
  5. Shipped by sea to Nevelsk, Sakhalin.
✓

Result

The material cost about 30% less than from local suppliers. Both cargoes — 3,500 t — arrived on one vessel.

2,000 tquicklime
1,500 tmineral filler
8producers checked
≈ 30%saving
Yantai → Panjin → Nevelsk

More shipments

in short — ask us for details
Steel structures · 2026

Steel structures to the Kuril Islands

Fabrication in China, production oversight, sea freight to one of the hardest-to-reach regions of Russia, customs clearance and hand-over of documents.

2 × 40′containers
≈ RUB 8.5Mdeal value
Turnkeyfactory to site
Private house · 2026

Fiber cement façade and aluminium curtain walls

Material selection, made-to-project production and delivery.

RUB 7M+value
To projectproduction
Oil & gas · 2026

Supply for oil and gas projects

Equipment and materials to industrial project requirements: full documents, specification control and EAC marking — for example, Thermon heat-tracing cable.

EACmarking and documents
To specproject requirements
Manufacturing · 2026

Spare parts for concrete plants

Components for precast and aerated-concrete lines: sourced in China and delivered without downtime.

≈ RUB 1Mvalue

A similar task? Tell us what you need to ship — we will work through it just as closely.

Talk on TelegramGet a quote
■ Experience & cases

What we ship

Our focus is industrial and construction supply, where exact specifications, documents and reliable delivery matter most.

Product lines over 8 years

hundreds of items from China
Steel structuresFiber cement façadesAluminum curtain wallsAPRO windows & doorsNew-generation WPCOil & gasAerated concrete raw materialsMineral filler for asphaltIndustrial machine tools & CNCPlant spare partsGraniteIndustrial boilersSoundproof hotel doors

For machines and equipment we help with installation and commissioning, and make sure the manufacturer supplies an English interface and documentation — no Chinese-only control panels.

New-generation WPC (wood-plastic composite) — with a factory warranty of up to 30 years.

■ From our shipments

What we source and ship

Factories, warehouses, loadings and finished sites — real photos by category.

See all photos
■ Contacts

Get a quote for your product

Message us on WhatsApp, WeChat or Telegram, or call: what you need, quantity and destination. We reply with a quote.

WeChat ID copied: sergey_chen
When to call
Dalian · China time--:--
Your time--:--

Our office is in Dalian, China (UTC+8). Calls are welcome 9:00–21:00 China time. At other times, message us on WhatsApp, WeChat or Telegram — we reply the same or next business day.